Complete set project of dragging steam turbine in an iron and steel plant

Source:   Release time:2022-10-13

Construction scale: 3 × 40t/h boiler+2 × 3.2MW steam turbine driven unit

PREV:Post installed steam turbine power generation project of a thermal power company NEXT:General contracting project of steam power double drive drive project of a steam turbine